Hazard report form for civil and roadworks crews
Short answer
Civil crews work in a line, not a building. The form needs a chainage or kilometre marker, the traffic layout and what was found underground. This page lists those fields, with a free PDF and Word template. The same fields can be filled by voice from the cab, with no signal.
What goes wrong in civil construction
Roadworks and pipelines run along a corridor, and the hazard moves with the machine. A report that says “the trench” is useless on a four-kilometre job. Civil crews also work next to live traffic, so the form leans on location and layout more than any other trade’s does.
- Cars cutting through or clipping the edge of the traffic layout
- Buried services hit while digging, or found where the plans said none
- Trench walls and batters that slumped after overnight rain
- Excavators and trucks reversing near people on foot
- Night works with lighting that leaves shadows at the trench edge
- Spoil heaps stacked too close to an open excavation
Fields that earn their place on a civil construction form
Out on a corridor, “near the culvert” gets you nowhere. These fields let someone who wasn’t there walk straight to the spot.
- Chainage or kilometre marker, and the side of the road
- Traffic management plan version in place and who set the layout out
- Services located before digging, with the Dial Before You Dig reference if used
- Plant ID and the operator on shift
- Rain or wind in the last 24 hours
- Shoring, batter or bench condition at the time
On paper and by voice
It’s 4am at chainage 2+400. Overnight rain has slumped the batter beside the open trench, and the ute’s parked a kilometre back with no coverage. On paper it goes in the diary and gets read tomorrow. By voice you describe the slump and take a photo with the pegs in it. The report waits on the phone until you drive back into range.
Where Haznote fits
Haznote queues the report on the phone and sends it when there’s signal again, so the photo and GPS point arrive together. The manager can see where on the job it sits and confirms the priority. The AI’s draft is stored apart from the manager’s version.
Download the form.
A free example to print or edit. It’s general information, not legal advice, and it asks for no email.
Plain answers.
Why chainage and not an address?
A corridor job has no street number for a trench. Chainage lets anyone find the spot, even after the pegs move.
Does a traffic incident go on this form?
A hazard in the layout does, such as a gap or a poor taper. An actual collision belongs on an incident report.
What if the whole crew is out of signal?
Report anyway. The report stays on the phone and sends itself when there’s coverage.
Where this comes from.
This page describes how Haznote works. It makes no claims about the law, so it cites no regulator.
Report a civil construction hazard by voice. A manager confirms it.
Run it on one site and see the first report land in the manager’s list.